Nesreen Ghaddar chaired AUB’s seventh Efficient Building Design conference, according to the university’s 9 November 2026 release. More than 300 people registered for the two-day event, which addressed ventilation, comfort and smart buildings. For a building owner, the useful question is how to turn that research agenda into a measurable renovation brief.
Start with the room that causes complaints
Choose a specific problem before comparing equipment: an overheated west-facing office, a stuffy meeting room or cooling that continues after everyone leaves. Ask an engineer to document when the problem occurs, how the space is occupied and what the existing system actually does. A larger machine should not be the automatic starting assumption.
Request a baseline that joins energy use with room conditions and operating hours. A bill alone cannot explain whether a change came from improved performance, fewer occupants or a different working schedule. Keep these explanations visible in the project file.
American University of Beirut · 2026-11-09
Compare the whole intervention
Ask bidders to separate shading, controls, ventilation and equipment replacement in their proposals. That makes it easier to see which measure addresses which problem and to compare maintenance access, disruption and replacement parts alongside purchase cost. Comfort should remain a stated acceptance criterion.
For a promised saving, ask whether it is modelled or measured and what assumptions were used. A forecast based on constant occupancy is not directly comparable with a building that opens irregularly. Request a method for checking the result after handover, including who pays for monitoring.
American University of Beirut · 2026-11-09
Make the handover usable
The owner’s practical deliverable is a short operating guide: settings, schedules, maintenance responsibilities and a process for reporting discomfort. Ask the designer to demonstrate the controls to the person who will actually manage the building.
This conference report does not establish a saving for any particular property or certify a retrofit. Its value is a better set of questions. A proposal becomes more credible when the contractor can explain how it will preserve comfort and how the owner will know whether the promised improvement occurred.
Related reading: Buying a home with solar panels in Lebanon? Check what comes with it.
American University of Beirut · 2026-11-09
Prepared and reviewed 13 November 2026. Source dates and project stages are stated in the article; practical questions are editorial analysis.
Sources
- AUB hosts international conference on smart and energy-efficient buildings
American University of Beirut · Published: 2026-11-09 · Accessed: 2026-11-13
Conference reported 9 November 2026; exact event dates not stated · Beirut; Nesreen Ghaddar chair, >300 registered, two-day event; not a performance audit or certification.



