INZEB’s Helping Homes project draws on qualitative interviews with residents affected by the 2023 Thessaly floods and the 2021 Arkalochori earthquake in Crete. Its event announcement for 30 September 2026 connects housing safety, resilience and policy. This is a research case study, not a new disaster report.
Listen before defining the renovation
Interviews can reveal problems that a simple count of repaired properties misses: how people experience returning home and what they need from recovery. Qualitative evidence is valuable for framing questions, but it is not a nationwide survey or proof that every affected household had the same experience.
The event page is also not evidence that every announced presentation took place. This article uses the project’s stated research basis, rather than presenting the programme as verified event proceedings.
INZEB · 2026-11-20
Separate safety, comfort and energy claims
For an owner planning work, keep distinct scopes for structural assessment, moisture-related repairs and energy improvements. A new window or insulation layer should not be treated as evidence that damage has been resolved. Qualified assessment must determine the appropriate sequence for the specific building.
Ask a proposed retrofit to state its baseline and whether any saving is modelled or measured. The Helping Homes page supplies no quantified performance result that would justify promising a percentage reduction in energy bills.
INZEB · 2026-11-20
A recovery brief that remains useful
Request a written description of work, responsibilities, access arrangements and how completion will be assessed. Consider the disruption to occupants and the maintenance requirements alongside the initial price. These are editorial questions for a project team, not prescribed engineering measures.
The lesson is to judge recovery through a usable, safe home and a documented scope. A refurbishment photograph, an energy label and an insurance or assistance decision each address different matters; none should be substituted for the others.
INZEB · 2026-11-20
Related reading
Piraeus Tower: Greece’s case for renovating before rebuilding
Prepared and reviewed 20 November 2026. Source dates and project stages are stated in the article; practical questions are editorial analysis.
Sources
- Helping Homes: housing safety and resilience
INZEB · Accessed: 2026-11-20
Event announcement 30 September 2026; Thessaly floods 2023; Arkalochori earthquake 2021 · Qualitative resident interviews; not a nationwide statistical survey



